ISSN:1009-5020 CN:42-1610/P
ZHANG Zhenglu, LUO Changlin, DENG Yong, XIE Niansheng. Design of high precision horizontal control network for large-scale hydropower projectJ. Geo-spatial Information Science, 2006, 9(4): 235-239. DOI: 10.1007/BF02826730
Citation: ZHANG Zhenglu, LUO Changlin, DENG Yong, XIE Niansheng. Design of high precision horizontal control network for large-scale hydropower projectJ. Geo-spatial Information Science, 2006, 9(4): 235-239. DOI: 10.1007/BF02826730

Design of high precision horizontal control network for large-scale hydropower project

  • A new solution of combination network of GPS and high precise distance measurements with EDM is proposed. Meanwhile, it's inadvisable only using GPS network without distance measurements. Three schemes: terrestrial network, GPS network and combination network are discussed for horizontal control network design of Xiangjiaba Dam in view of precision, reliability, coordinate and outlay in detail.
  • loading

Catalog

    Turn off MathJax
    Article Contents

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return