Design of high precision horizontal control network for large-scale hydropower project
-
Graphical Abstract
-
Abstract
A new solution of combination network of GPS and high precise distance measurements with EDM is proposed. Meanwhile, it's inadvisable only using GPS network without distance measurements. Three schemes: terrestrial network, GPS network and combination network are discussed for horizontal control network design of Xiangjiaba Dam in view of precision, reliability, coordinate and outlay in detail.
-
-